EN 1992-4 (Eurocode 2, Part 4) is the European standard for fastenings in concrete. It replaced the older ETAG 001 Annex C and EOTA TR 029 methods. This guide shows how a post-installed anchor is checked, with a short worked example you can repeat by hand or in AAS.

1. What you need before you start

An anchor design needs three groups of data. The design checks combine them; none of them can be guessed.

2. The failure modes in tension

EN 1992-4 checks every way the fastening can fail, and the smallest resistance governs. For a bonded (injection) anchor in tension these are:

For concrete failures the partial factor is γMc = γc · γinst, normally 1.5 × 1.0 = 1.5, unless the ETA gives a higher γinst.

3. Worked example: one bonded anchor in tension

One M12 threaded rod, steel grade 5.8, set with injection resin at hef = 110 mm into cracked C25/30 concrete, at least 165 mm from every edge. Design tension NEd = 15 kN, static, mostly short-term. The bond strength used here, τRk = 7.0 N/mm² in cracked concrete, is an illustrative value: always take it from the ETA of the product you install.

CheckCharacteristic resistancePartial factorDesign resistanceUtilisation
Steel: 84.3 mm² × 500 N/mm²42.1 kNγMs = 1.528.1 kN0.53
Concrete cone: 7.7 × √25 × 110^1.544.4 kNγMc = 1.529.6 kN0.51
Bond: 7.0 × π × 12 × 11029.0 kNγMp = 1.519.4 kN0.78

The bond check governs: 15 / 19.4 = 0.78 ≤ 1.0, so the anchor is adequate in tension. Far from the edges, with a single anchor, all the reduction factors equal 1.0 (ψre,N = 0.5 + hef/200 = 1.05 is capped at 1.0). Near an edge, or in a group, the projected areas Ac,N and Ap,N and the factors ψs,N, ψec,N reduce the cone and bond resistances, and the check must be repeated.

4. Shear, and tension with shear

In shear EN 1992-4 checks steel failure with and without a lever arm, concrete pry-out (k8 × the tension resistance of the concrete), and concrete edge failure, which often governs close to an edge. When tension and shear act together, the utilisations are combined, for concrete failures with (βN)1.5 + (βV)1.5 ≤ 1, and for steel failure with (βN)² + (βV)² ≤ 1.

5. Where hand calculation stops

6. Do this calculation in AAS

AAS performs every check of EN 1992-4 for single anchors and groups: it finds the anchor loads under a rigid or flexible base plate, applies the edge and spacing factors, checks tension, shear and their interaction, and prints a report with each step. It runs in your browser, and your project stays on your own computer.

Do this calculation in AAS, free in your browser →

This guide explains the method; it is not a design. Every fastening must be designed and checked by a qualified engineer with the values of the ETA of the product used.