Post-installed rebar: anchorage length step by step (EN 1992-1-1)
When new concrete is connected to existing concrete, reinforcing bars are often bonded into drilled holes with injection resin. Designed as rebar, not as anchors, they follow the anchorage and lap rules of EN 1992-1-1, section 8.4 and 8.7, with the bond strength given in the European Technical Assessment (ETA) of the resin. This guide shows the calculation with a worked example.
1. Rebar or anchor? Choose the right method first
A post-installed bar is designed as rebar when it transfers its force by lap to the existing reinforcement, or is anchored where the existing member can take the force (end anchorage of a slab or beam). The concrete then fails only along the bar, and EN 1992-1-1 applies.
When the bar only holds a fixture and nothing in the existing member takes over its force, it is an anchor: the concrete can fail as a cone, and the design follows EN 1992-4 (see the anchor design guide).
2. The data you need
- The bar: diameter φ, steel grade (for example B500B, fyk = 500 N/mm²), and the stress σsd it must carry. Without a smaller value from the analysis, take the full design yield strength fyd = fyk/1.15.
- The existing concrete: strength class, concrete cover and bar spacing, and whether the bond conditions are good.
- The resin's ETA: the design bond strength fbd,PIR per concrete class and drilling method, the minimum cover for drilling, the maximum embedment depth, and any rule on the minimum lengths.
3. The formulas
- Basic required anchorage length: lb,rqd = (φ / 4) · (σsd / fbd).
- Design anchorage length: lbd = α1 α2 α3 α4 α5 · lb,rqd ≥ lb,min, with α2 = 1 − 0.15 (cd − φ)/φ between 0.7 and 1.0 for straight bars. Use the α factors only as far as the ETA allows them for post-installed bars.
- Minimum length in tension: lb,min = max(0.3 lb,rqd; 10φ; 100 mm). Many ETAs require longer minimum lengths for post-installed bars: check yours.
- Lap with an existing bar: l0 = α6 · lb,rqd (with the other α factors) ≥ l0,min, where α6 is between 1.0 and 1.5 depending on the share of bars lapped in one section.
4. Worked example: Ø16 starter bars into an existing slab
Ø16 bars, B500B, at full yield: σsd = fyd = 500 / 1.15 = 434.8 N/mm². Existing concrete C25/30, good bond conditions. The design bond strength used here, fbd,PIR = 2.7 N/mm², equals the cast-in value of EN 1992-1-1 for C25/30 (2.25 × 1.8 / 1.5); it is an illustrative value: take it from the ETA of the resin you install, for your drilling method.
| Step | Calculation | Result |
|---|---|---|
| Basic required length | lb,rqd = 16/4 × 434.8/2.7 | 644 mm |
| Minimum length | max(0.3 × 644; 10 × 16; 100) | 193 mm |
| Design length, all α = 1 | lbd = 644 mm ≥ 193 mm | 644 mm |
| If the bar needs only 300 N/mm² | lb,rqd = 16/4 × 300/2.7 | 444 mm |
| Cover cd = 48 mm, if the ETA allows α2 | α2 = 1 − 0.15 × (48 − 16)/16 = 0.70 | 451 mm |
| Lap with existing bars, α6 = 1.5 | l0 = 1.5 × 644 | 966 mm |
The drilled depth is the design length plus any part of the hole that is not counted (for example a damaged surface layer). Check it against the member thickness, the maximum embedment of the ETA, and the existing bars at the far face, which the drill must not reach.
5. What else to check
- Shear at the interface between old and new concrete (EN 1992-1-1, 6.2.5), with the roughness of the existing surface.
- The minimum concrete cover and spacing for drilling, which depend on the drilling method and are given in the ETA.
- Fire: at high temperature the bond strength drops, so a fire-exposed connection needs the bond-temperature curve of the ETA.
- Seismic and fatigue loads need values that the ETA covers explicitly.
6. Do this calculation in ARS
ARS designs post-installed rebar connections to EN 1992-1-1: it computes the anchorage and lap lengths with the resin's bond values, checks the interface shear, fire, fatigue and seismic detailing, and gives the drilling depths, a drilling plan, the bar list and the resin quantity. It runs in your browser, and your project stays on your own computer.
This guide explains the method; it is not a design. Every connection must be designed and checked by a qualified engineer with the values of the ETA of the resin used.